Use este identificador para citar ou linkar para este item: http://localhost:8080/xmlui/handle/123456789/202
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.authorRenato Pereira Junior, Sebastião-
dc.contributor.authorPassos da Silva, Patricia-
dc.date.accessioned2026-10-23T18:18:36Z-
dc.date.available2026-10-23T18:18:36Z-
dc.date.issued2026-10-22-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/202-
dc.description.abstractThe implementation of the Kaizen project in the stages of manufacturing, galvanizing, pre-assembly, and shipment of power transmission towers aims primarily to optimize the production process by minimizing waste and increasing operational efficiency, with a strong emphasis on continuous quality improvement and reduction of manufacturing time. This approach is applied through detailed workflow analysis, identification of bottlenecks, and the adoption of best practices, encompassing the processes of cutting, drilling, marking, bending, trimming, galvanizing, and pre-assembly, ensuring the correct assembly of the tower before shipment to the construction site. The results include a significant reduction in total manufacturing time, decreased rework and nonconformities, and increased customer satisfaction through faster deliveries and high-quality products.en
dc.subjectKaizen, Torre de Transmissão de Energia, Manufatura Enxutaen
dc.titlePROJETO KAIZEN NA FABRICAÇÃO DE TORRE DE TRANSMISSÃO DE ENERGIAen
Aparece nas coleções:TCC

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
PATRÍCIA PASSOS DA SILVA2.pdf1,44 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.